UNIT 4 is a gable end industrial / manufacturing premises of steel portal frame construction with concrete floor, brick built walls to dado, surmounted via insulated profile cladding. Internally the premises are predominantly arranged to provide an open plan warehouse with ancillary offices, kitchen/tea prep, WC's and changing facilities.
The property benefits from a minimum / maximum eaves height of approx. 7.3M and 9.5M respectively. In addition, the property further benefits from a 3 phase power supply and 2x 15 tonne overhead cranes. Heating to the warehouse is provided from radiant gas heating units with high level lighting via LED bulb light fitments, supplemented from a high level of natural light via the translucent roof panels. Access to the premises is from 2x large scale commercial roller doors to the warehouse and a further 2x commercial roller doors to the workshop and office section. There is additional pedestrian access also provided.
UNIT 5 is a stand alone industrial / manufacturing premises of steel portal frame construction with concrete floor, brick built walls to dado, surmounted via insulated profile cladding. Internally the premises are predominantly arranged to provide an open plan warehouse with ancillary offices, kitchen/tea prep, WC's and changing facilities.
The property benefit from a minimum /maximum eaves height of approx. 5.8M and 7.5M respectively. In addition the property further benefits from a 3 phase power supply and 2x 5 tonne overhead cranes. Heating to the warehouse is provided from gas blower units with lighting via high bay sodium light fitments, supplemented from a high level of natural light via the translucent roof panels.
Access to the premises is from 2x commercial roller doors with separate pedestrian access also provided.
The units can be available separately or together.