The building is undergoing an extensive programme of refurbishment and improvement, integrating enhanced welfare provision, and a new M&E installation incorporating the latest sustainability technology
Fully refurbished building and designed to target WELL Standard criteria
Reconfigured and extended entrance zone to provide improved entrance experience and enhanced reception area with integrated welfare and breakout space
Enhanced welfare provision to incorporate new cycling facilities including secure cycle storage with electric charging, maintenance and repair station, along with showers, changing area with lockers and drying room
Reconfigured central core to provide new BCO compliant 'superloo' toilet facilities, DDA compliant toilets and a IT / server / comms room at each level
New M&E installation to include new lighting incorporating circadian rhythms, new VRF comfort cooling and ventilation systems, and new lifts
Dedicated fibre connection and WiredScore compliant digital connectivity
New and refurbished building fabric to include, new ceilings, new and upgraded glazing systems, new internal doors and high quality finishes throughout
Floorplates extended into external terrace areas First and second floor to increase usable floor space
Overview
AVAILABLE FOR OCCUPATION Q1 2023
Broadway Park comprises four, 3-storey office buildings arranged around a private internal access road accessed from the Edinburgh Bypass (A720). The site layout provides ample parking yet includes high quality landscape with grassed areas, along with planting and well established trees to create a quiet and attractive environment.
Broadway 2 sits at the end of the central access road through the site. The existing 3 storey building provides 40,460 sq ft of office space within an arrangement of bright, spacious and generously proportioned floorplates.